Complete project scope
We turn a defined biomethane opportunity into a coordinated, constructible and commissionable plant.
The exact contracting model can be matched to the project: engineering only, technology and equipment package, construction support, or an integrated EPC scope with a single delivery basis.

Representative project imagery; construction methods and sequencing are project-specific.
Engineering
Define the plant before committing capital.
Front-end work establishes the data and decisions required for reliable procurement, site execution and start-up.
Feasibility & concept engineering
Feedstock characterisation, capacity definition, technology screening, mass and energy balance, utility demand, plot plan and preliminary capital scope.
Basic & detailed engineering
Process design, equipment specifications, civil and structural packages, piping, electrical distribution, instrumentation, automation and coordinated construction drawings.
Balance-of-plant integration
Battery limits and interfaces across feedstock handling, digestion, gas upgrading, utilities, gas export, digestate and site infrastructure.
Safety & operability reviews
Process safeguards, hazardous-area requirements, access, maintainability, drainage, odour control and operating philosophy embedded in the design.
Procurement & construction
Coordinate supply with the site programme.
Procurement packages, civil readiness and installation sequence are planned as one execution system.
Equipment procurement
Technical requisitions, bid evaluation, vendor coordination, document review, inspections and delivery tracking.
Civil & structural works
Earthworks, foundations, buildings, bunds, roads, drainage and structural supports prepared for plant installation.
Mechanical & E&I installation
Tanks, process equipment, piping, cabling, instruments, controls and utility connections installed to approved drawings.
Construction management
Schedule, interfaces, quality records, HSE controls, inspections, testing and punch-list closure managed to turnover.
Commissioning & handover
Prepare the operators and the biology.
Anaerobic digestion start-up is a controlled transition, not a single switch-on event.
Mechanical completion checks, cleaning, pressure and leak testing, loop checks, motor rotation and system energisation.
Water runs, control-sequence testing, interlock verification and functional testing of each plant system.
Inoculation, controlled loading, temperature and mixing stabilisation, laboratory monitoring and gradual gas production.
Defined performance verification, operator training, operating manuals, spares information and final turnover records.