About BIO.GAS
We are a biomethane engineering and construction company focused on complete, buildable process plants.
Our work connects anaerobic digestion, gas upgrading and the balance of plant required to make them operate together. We support project owners from early definition through construction, commissioning and handover.

Representative project imagery; every BIO.GAS scope is defined against the specific project basis.
Our responsibility
Keep the whole plant in view.
Biomethane projects succeed at their interfaces: between feedstock and biology, process and equipment, civil works and installation, commissioning and operations.
Engineering integrity
Requirements, calculations, drawings and vendor data remain connected to one approved design basis.
Construction readiness
Access, lifting, installation sequence, testing and commissioning needs are considered during design.
Operating perspective
Maintainability, controls, training and routine operator decisions influence the plant we specify and build.
How we work
Clear decisions at every stage.
Delivery is organised around stage outputs, interface ownership and information needed for the next commitment.
Understand the project basis
Confirm feedstock, capacity, gas product, site, utilities, regulatory context, battery limits and commercial priorities.
Develop the integrated design
Coordinate process, civil, mechanical, electrical, automation and site infrastructure into a buildable plant definition.
Manage supply and construction
Align vendor documents, delivery dates, site readiness, installation quality, testing and change control.
Commission and transfer knowledge
Bring each system online in sequence, stabilise the biological process and hand over the information operators need.
Working standards
Professional delivery without vague claims.
We prefer a clear scope, measurable acceptance criteria and documented project controls over unsupported promises.
Defined scope
Deliverables, battery limits, exclusions and owner inputs recorded before execution.
Controlled change
Technical, cost and schedule effects made visible before changes are approved.
Verified quality
Inspection and test evidence organised around the systems that must be commissioned.
Transparent handover
Open items, performance conditions and operating information clearly documented.